Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
East Port Water Reclamation Facility Expansion
Last Updated: 03/21/2024 类别:公用事业 当前阶段: 建设
This project includes the expansion of the current water reclamation facility to treat six million gallons of wastewater per day to nine million gallons per day. The project also includes advanced wastewater treatment, which is a valuable addition to the treatment process to ensure treated water has as low concentrations of nutrients as possible.Last Updated: 03/21/2024 类别:公用事业 当前阶段: Planning and Project Approval
This project includes extending sewer lines to provide service to certain developed properties within five project areas along the improved US 41 Corridor.
Mid-County Library Hurricane Repairs
Last Updated: 03/21/2024 Category: 县设施 当前阶段: Planning and Project Approval
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Lakeview/Midway Wastewater Expansion
Last Updated: 03/21/2024 类别:公用事业 当前阶段: Planning and Project Approval
This project proposes construction of a wastewater collection system to service approximately 1,500 properties with sewer service, new water service lines and a vacuum station that will provide sewer collection for the wastewater system.Cape Haze Wastewater Expansion
Last Updated: 03/21/2024 类别:公用事业 类别:公用事业 当前阶段: Planning and Project Approval
This project proposes construction of a wastewater collection system to service approximately 500 properties with sewer service, new water service lines and a station that will provide sewer collection for the wastewater system.小威廉·R·盖恩斯. Veterans Memorial Park Phase II
Last Updated: 03/21/2024 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
威廉R. 盖恩斯小. Veterans Memorial Park phase II design and construction.Family Services Center - Phase 2
Last Updated: 03/19/2024 Category: 已缴纳的销售税 Category: 县设施 当前阶段: 离职及清仓
Completed the 人类服务 integrated services model with Phase 2 following the completion of Phase 1. Phase 2 enabled youth services to be constructed as a separate building on the campus. In Phase 2 of the FSC project, the 人类服务' staff offices were constructed along with critical shared support facilities, 制造商的空间, 扩大服务范围.